Underground work done right stays invisible
The best utility work is the kind nobody thinks about again. Pipes stay at the right slope, joints don't leak, and the ground above stays level. That comes down to the parts you can't see after backfill: depth, bedding, slope and compaction.
What we install
- Water service lines from the meter or well to the building
- Sanitary sewer laterals to the public main
- Storm pipe, inlets and yard-drain piping
- Conduit for power, data and site lighting, coordinated with the electrician and utility
- Culverts under drives and roads
Safety in the trench
Trench collapse is one of the deadliest hazards in construction. Trenches five feet or deeper need a protective system, such as sloping, benching, a trench box or shoring, under OSHA rules. We plan trench protection before we dig.
Part of a bigger site
Utility work usually happens in the middle of a site job, after grading and before paving. Pairing it with our commercial site development or residential lot prep keeps the sequence tight.