670 Old Hull Rd, Suite A, Athens, GA 30601 Mon–Fri 8 AM–5 PM
contact@probuiltathens.com

Resources

Georgia Erosion Control Rules, Explained

Georgia takes mud seriously. If you're clearing or grading land, here are the rules that apply, in plain English.

Smooth-drum roller compacting a dirt road

Plain-English summary for property owners. It isn't legal advice; confirm details with your local issuing authority or Georgia EPD.

The Erosion and Sedimentation Act

Georgia's Erosion and Sedimentation Act of 1975 requires best management practices on land-disturbing activities and sets up local enforcement through counties and cities certified as local issuing authorities. The Georgia Soil and Water Conservation Commission publishes the Manual for Erosion and Sediment Control in Georgia, the playbook for the controls used on site.

The one-acre line

Projects that disturb one acre or more, or smaller tracts that are part of a larger common plan of development of an acre or more, need coverage under Georgia EPD's construction stormwater general permits:

  • GAR100001 for stand-alone construction projects
  • GAR100002 for infrastructure projects
  • GAR100003 for common development projects such as subdivisions

Coverage means filing a notice of intent, following an erosion, sedimentation and pollution control plan, inspecting controls, sampling where required, and filing a notice of termination when the site is stabilized. EPD reissues these permits periodically, so check its construction stormwater page for the current versions.

Buffers along state waters

The Act protects a 25-foot buffer along state waters, measured horizontally from the point where vegetation has been wrested by normal stream flow, and 50 feet on trout streams. Land disturbance inside the buffer needs a variance unless an exemption applies. Local ordinances may add wider stream buffers.

Certification

GSWCC runs certification courses for people who install, inspect and design erosion controls. Level IA (fundamentals) is for people on site doing the work and inspections. Plans for permitted sites are prepared by design professionals with Level II certification.

What "best management practices" look like on site

  • Perimeter controls (silt fence or similar) installed before land disturbance
  • A stone construction exit at every vehicle entrance
  • Inlet protection on nearby storm drains
  • Sediment traps or basins on larger sites
  • Phasing work so less soil is bare at once
  • Stabilizing finished areas with seed, mulch or matting
  • Inspecting and repairing controls after rain

See how we handle this on real jobs: erosion & sediment control.

Got dirt to move?

Tell us where the lot is and what you want to build. We'll walk it, explain what the site needs and give you a clear written quote.