Our Site Work Process

What happens, in what order, and why, from the first phone call to grass growing on the final grade.

Smooth-drum roller compacting a dirt road

Site work follows a logical order because each step depends on the one before it. Here is how a typical ProBuilt job runs.

1. First call and site walk

You tell us the address or parcel and what you want to build. We look at aerial and county parcel maps, then walk the property, ideally with you. We're looking at access, slope, soil, trees, water (creeks, springs, low spots), existing utilities and neighbors.

2. Scope and written quote

We put the job in writing: what we'll clear, where the pad sits and at what elevation, how the driveway runs, how water will be handled, and what's not included. Clear scope is the best protection against surprises for both of us.

3. Permits and paperwork

Depending on the county and the size of the job, this may include:

  • A land disturbance permit from the county or city
  • Georgia EPD construction stormwater coverage (a notice of intent) for one acre or more of disturbance
  • A driveway permit from the county or GDOT
  • Environmental Health septic approval for lots without sewer
  • Georgia 811 utility locates before any digging

See our site work permits guide for details.

4. Erosion control goes in first

Silt fence, a stone construction exit and inlet protection go in before the first tree is cut. That's both the law and good practice. See erosion control.

5. Clearing and grubbing

We clear the approved area, protect the trees you're keeping, and remove stumps and roots where there will be a pad, a drive or fill. See land clearing.

6. Grading and pads

Topsoil is stripped and saved, the site is cut and filled toward final elevations, and fill is compacted in lifts. Pads are built and checked for height. See grading & excavation and building pads.

7. Utilities, drainage and driveway

Trenches for water, sewer, power and storm lines are dug, bedded and backfilled. The driveway gets its base stone. Drainage structures go in.

8. Final grade and stabilization

After construction, we return to set the final grade so water moves away from the building, spread topsoil and seed or straw. Temporary erosion controls come out once the ground is stabilized.

Frequently asked questions

How soon can you start?
That depends on permits more than equipment. Jobs that need no permit can often start quickly. Permitted jobs start once the county issues the land disturbance permit and, for an acre or more, once state stormwater coverage is in place.
Do you need plans before quoting?
For a driveway, a pad or a clearing job, an address and a conversation are usually enough. Commercial sites and subdivisions are quoted from the civil plans.

Got dirt to move?

Tell us where the lot is and what you want to build. We'll walk it, explain what the site needs and give you a clear written quote.