Why it matters on every job
Georgia's Erosion and Sedimentation Act requires anyone disturbing land to use best management practices to keep soil on site. On projects of one acre or more, Georgia EPD's construction stormwater permit adds a written plan, inspections and records. Red clay washes off a bare slope fast, and once it reaches a road or creek it becomes a cleanup bill and a compliance problem.
Good erosion control also protects your own work. A pad, driveway or slope that washes out in the first storm has to be rebuilt.
The toolbox
| Control | What it does |
|---|---|
| Silt fence | Slows sheet flow and traps sediment at the edge of the site |
| Construction exit | A stone pad that knocks mud off tires before trucks reach the road |
| Inlet protection | Keeps sediment out of storm drains |
| Sediment trap or basin | Holds muddy water so the soil settles out |
| Check dams | Slow water in ditches and swales |
| Seed, straw and matting | Covers bare soil so rain can't move it |
Maintenance is half the job
Controls only work if they're maintained. Silt fence gets undermined and overtopped, exits fill with mud, and inlet protection clogs. We check and repair controls during the job and after significant rain. On permitted sites that's documented as the permit requires.
Learn the rules
Our Georgia erosion control rules guide explains the one-acre threshold, state-water buffers and certification in plain English.