670 Old Hull Rd, Suite A, Athens, GA 30601 Mon–Fri 8 AM–5 PM
contact@probuiltathens.com

Site work · Athens & Northeast Georgia

Building Pads in Athens, GA

A level, compacted base set at the right height, so the slab or foundation that goes on top stays put. House pads, garage and shop pads, barn pads and commercial building pads.

Flat graded building pad with equipment at the edge
Building Pads
Residential & commercial

What makes a good pad

A building pad looks simple: a flat area of dirt. What matters is underneath it. A good pad is built on firm, organic-free ground, from fill placed in thin, compacted lifts, at the elevation the house or building needs, with edges that shed water.

Skip any of those and the slab is the thing that pays for it.

Pads we build

  • House pads for slab-on-grade and crawlspace homes
  • Garage, shop and barn pads, including oversized pads for equipment buildings
  • Commercial building pads built to engineered specifications
  • Pads for accessory buildings, sheds and carports
  • Pool and outdoor living pads

Elevation and drainage come first

The pad's height sets how every other part of the lot drains. We check it against the street, the septic or sewer connection, the driveway slope and the natural fall of the land before we place any fill. Getting it right here is far cheaper than regrading a finished yard.

Built for Piedmont clay

Red clay makes an excellent pad when it's compacted at the right moisture content, and a poor one when it's placed wet. We time pad work around the weather and condition the soil before compacting. Learn why in building on Georgia red clay.

Cut & fill, step by step

Watch a lot get graded

Scroll down and the dozer works the lot: high ground is cut, low ground is filled and compacted, and the pad comes up level, ready for a foundation.

How it goes

Our building pads process

Every site is different, but the order of work rarely is. Here's what to expect from first call to final grade.

  1. Stake it out

    We mark the building corners and the finished pad elevation from your plans or survey.

  2. Strip to good ground

    Topsoil, roots and soft material come out until we reach firm native soil.

  3. Build it in lifts

    Fill goes down in thin layers. Each lift is moisture-conditioned and compacted before the next.

  4. Check height and level

    The pad is brought to grade with a laser and checked so your foundation crew starts on a known surface.

  5. Shape the edges

    Side slopes are shaped, extended past the footprint and stabilized so the pad edge doesn't erode.

Questions

Building Pads FAQ

How high should my pad be?
High enough that the finished floor sits above the surrounding ground with room for the yard to slope away. Your plans, the lot's drainage and local code set the number. We build to the elevation on your plans or help you set a sensible one.
Does a pad need compaction testing?
Commercial and engineered projects usually require testing by a soils lab. For many residential pads it isn't required, but the same compaction method applies either way. If your builder or lender wants test results, we'll coordinate with the testing firm.
Can you build a pad on a sloped lot?
Yes. On slopes we cut the high side and fill the low side, then key the fill into the hillside. Steeper lots may also need a retaining wall or a stepped foundation. See retaining walls.
How long should a new pad sit before the slab?
A properly compacted pad doesn't need to sit and settle. Pads built from loose fill do, which is exactly why fill should be compacted in lifts in the first place.

Where we work

Building Pads near you

We handle building pads across Athens-Clarke, Oconee, Jackson, Madison, Barrow, Oglethorpe, Walton and Morgan counties.

Got dirt to move?

Tell us where the lot is and what you want to build. We'll walk it, explain what the site needs and give you a clear written quote.