Before you buy (or right after)
- Get a boundary survey or recorded plat, so you know exactly where the lines and corners are.
- Check zoning and setbacks with the county or city planning office, plus any HOA covenants.
- Confirm water: public water tap, or a well site.
- Confirm sewer or septic. No sewer? Get a soil evaluation and septic approval through the county Environmental Health office. The septic layout shapes the whole site plan.
- Look for water: creeks, springs, low wet areas and state-water buffers that limit where you can disturb.
- Check road access and whether the road is county, state or private. That decides who issues the driveway permit.
Planning the site
- Place the house on the site plan, not just on the lot: pad elevation, garage orientation and where the driveway arrives.
- Decide which trees to keep, and walk the lot to flag them.
- Plan the driveway route for grade, sight lines at the road and how water crosses it.
- Plan utilities: the power route (overhead or underground), the water line and the sewer or septic line.
- Think about drainage: where roof and yard water will go once the house is built.
Permits and paperwork
- Land disturbance permit, if your county requires one for your project
- Georgia EPD stormwater coverage if disturbance reaches one acre or more
- Driveway permit
- Septic permit (Environmental Health)
- Building permit
- Georgia 811 locate before digging
See site work permits for who issues what around Athens.
Order of work
- Erosion control and construction exit
- Clearing and grubbing
- Driveway base, so trucks can get in
- House pad, built and compacted
- Utility trenches
- Foundation and construction
- Final grade, topsoil and seed
Ready to talk?
Send us your survey, house plan and address, and we'll walk the lot. Read more about residential lot preparation or get a quote.